Author Archives: Tommy.Edward

W11_TOM_Finalizing Our Lovely House Brownfield Project WBS and Risk Register


1. Problem Definition

Refer to my W10 Blog (https://simatupangaace2014.wordpress.com/2013/11/09/w10_tom_developing-wbs-risk-register-for-our-lovely-house-brownfield-project-by-using-humphreys-earned-value-project-management-technique/) that Our Lovely House Renovation Project WBS and Risk Register have been drafted and further in this W11 blog I will finalize the WBS and the Risk Register.

  Continue reading

2 Comments

Filed under Tommy Edward, Week 11

W10_TOM_Developing WBS & Risk Register for “Our Lovely House Brownfield Project” by using Humphreys Earned Value Project Management Technique


1. Problem Definition

Refer to my W9 Blog (https://simatupangaace2014.wordpress.com/2013/11/07/w9_tom_setting-up-our-lovely-house-brownfield-project-by-using-humphreys-earned-value-project-management-technique/), I have finished the step 1 – Identifying Project Objective and already proceeded into Step 2 – Work Scope Definition and Risk Assessment. The problems to be solved in this W10 blog are creating the WBS and do the Risk Assessment. Continue reading

2 Comments

Filed under Tommy Edward, Week 10

W9_TOM_Setting up “Our Lovely House Brownfield Project” by using Humphreys Earned Value Project Management Technique


1. Problem Definition

I am planning to renovate my house in sha Allah in February 2014 and I will call it “Our Lovely House Brownfield Project”.

The term brownfield was originally used in construction and development to reference land that at some point was occupied by a permanent structure. In a brownfield project the structure would need to be demolished or renovated. (Source: http://www.webopedia.com/TERM/B/brownfield.html)

  Continue reading

3 Comments

Filed under Tommy Edward, Week 09

W8_TOM_ Lease VS Purchase Impact to Profit & Loss Statement with Case Study: a Mini-Mart Business


1. Problem Definition

As I have mentioned in my previous blog (https://simatupangaace2014.wordpress.com/2013/10/18/w7_tom_-lease-vs-purchase-own-analysis-of-a-diesel-generator/) , I will try to simulate how Lease VS Purchase impacts the profitability (Profit and Loss Statement or P&L).

Continuing from previous blog, the case study is still a mini-mart business.

Continue reading

1 Comment

Filed under Tommy Edward, Week 08

W7_TOM_ Lease VS Purchase (Own) Analysis of a Diesel Generator


1. Problem Definition

I am planning to start my own business and one from many business options seems favorable to me is investing in retail sectors which is a mini-mart at suburban area.

I wanted to have a 24 hours service mini-mart therefore need to have a Diesel Generator as a back-up power.

For information, a diesel generator is the combination of a diesel engine with an electric generator (often an alternator) to generate electrical energy.

Diesel generating sets are used in places without connection to the power grid, as emergency power-supply if the grid fails, as well as for more complex applications such as peak-lopping, grid support and export to the power grid. Sizing of diesel generators is critical to avoid low-load or a shortage of power and is complicated by modern electronics, specifically non-linear loads. (Source: http://en.wikipedia.org/wiki/Diesel_generator)


Picture 1- Diesel Generator

Source: http://acehardware.co.id/product/product_detail/1398#.Ul9hk9Lwmnk

Continue reading

6 Comments

Filed under Tommy Edward, Week 07

W6_TOM_ Choosing MBA Program by Using Multi-Attribute Decision Making Compensatory Models.


1. Problem Definition

Ms. XY has intention to enter next education level through a Master of Business and Administration degree. And she is strongly determined to choose MBA program which best fit with her preferences. And what she asked is advice on which one is the best MBA program for her.

  Continue reading

2 Comments

Filed under Tommy Edward, Week 06

W5_TOM_ Choosing MBA Program by Using Multi-Attribute Decision Making Non-Compensatory Models


  1. Problem Definition

Ms. XY has intention to enter next education level through a Master of Business and Administration degree. And she is strongly determined to choose MBA program which best fit with her preferences. And what she asked is advice on which one is the best MBA program for her.

  Continue reading

4 Comments

Filed under Tommy Edward, Week 05

W4_TOM_FPSO Time Charter Commercial Bid Evaluation using Discounted Time Value of Money (WACC) Technique


1 – Problem Recognition, Definition and Evaluation

According to American Petroleum Institute, there are 9 (nine) types of Production Facilities which are:

  1. Deepwater Development Systems
  2. Fixed Platform (FP)
  3. Compliant Tower (CT) 
  4. Tension Leg Platform (TLP)
  5. Mini-Tension Leg Platform (Mini-TLP)
  6. SPAR Platform (SPAR) 
  7. Floating Production System (FPS) 
  8. Subsea System (SS) 
  9. Floating Production, Storage & Offloading System (FPSO)

Source: http://www.api.org/oil-and-natural-gas-overview/exploration-and-production/offshore/offshore-production-facilities

In an oil field Facility Development Project that I am working for now, FPSO is the chosen option for the production facility.


Picture 1 – Picture of an FPSO

Source: http://www.rigzone.com/training/insight.asp?insight_id=299&c_id=12

  Continue reading

1 Comment

Filed under Tommy Edward, Week 04

W3.1_TOM_Using Multiattribute Decisions Making Tools & Techniques to Determine Best Transportation Mode of Home-Office-Home


1 – Problem Recognition, Definition and Evaluation

I am one of million commuters who travel every day to Jakarta for business purpose. Traffic in Jakarta is a nightmare; Vehicles Growth in Jakarta is 11% while Road Growth is only 0.01% (http://www.tribunnews.com/metropolitan/2013/03/05/kendaraan-tumbuh-11-jalan-cuma-tumbuh-001).

It was predicted that in 2014 there will be saturated traffic congestion in Jakarta as shown in Figure 1 below if private vehicles are uncontrollable. I have to anticipate this situation and my plan is to formulate which is the best option transportation mode to take on.


Figure 1 – Preliminary Prediction Comparation between Utilization of Vehicles with Total Road Area in Jakarta

Source: http://www.ui.ac.id/download/apru-awi/jakarta-local-goverment.pdf

  Continue reading

1 Comment

Filed under Tommy Edward, Week 03

W3_TOM_Using Multiattribute Decisions Making Tools & Techniques to Determine Best Transportation Mode of Home-Office-Home


1 – Problem Recognition, Definition and Evaluation

I am one of million commuters who travel every day to Jakarta for business purpose. Traffic in Jakarta is a nightmare and it was predicted that in 2014 there will be saturated traffic congestion in Jakarta as shown in Figure 1 below if private vehicles are uncontrollable. I have to anticipate this situation and my plan is to formulate which is the best option transportation mode to take on.


Figure 1 – Preliminary Prediction Comparation between Utilization of Vehicles with Total Road Area in Jakarta

Source: http://www.ui.ac.id/download/apru-awi/jakarta-local-goverment.pdf

  Continue reading

2 Comments

Filed under Tommy Edward, Week 03