Category Archives: Hari W

W9.1_HWB_Soybean in Gold Equivalent Value


1. Problem Definition

Indonesia is still importing 75% of the domestic soybean demand of 2.5 million tons. The high dependence on imported soybeans make the government was powerless when soybean prices rose due to the weakening of the rupiah against the U.S. dollar (U.S.).[1] As we know that soybean is the basic ingredients for tofu and tempe which are the most popular food here. Now I try to made 12 months future cost estimation of imported soybean price and use a new alternative currency reference with gold that consider as stable currency.

Continue reading

1 Comment

Filed under Hari W, Week 09

W9_HWB_Soybean in Gold Equivalent Value


1. Problem Definition

Indonesia is still importing 75% of the domestic soybean demand of 2.5 million tons. The high dependence on imported soybeans make the government was powerless when soybean prices rose due to the weakening of the rupiah against the U.S. dollar (U.S.).[1] As we know that soybean is the basic ingredients for tofu and tempe which are the most popular food here. Now I try to made 6 months future cost estimation of imported soybean price and use a new alternative currency reference with gold that consider as stable currency.

Continue reading

3 Comments

Filed under Hari W, Week 09

W8.2_HWB_Forecast of Construction Cost with Gold Price


1. Problem Definition

In this 8th blog I will try to calculate the construction price forecast for Drilling Site Preparation (DSP) for year 2022 with predictions based on the gold price increases. As we know the value of gold has relative purchasing power remains. The cost price that would be predicted is for budgeting POFD (Plan of Future Development) in onshore oil and gas field as part of the 30 years contract.

Continue reading

3 Comments

Filed under Hari W, Week 08

W8.1_HWB_Forecast of Construction Cost with Gold Price


1. Problem Definition

In this 8th blog I will try to calculate the construction price forecast for Drilling Site Preparation (DSP) for year 2022 with predictions based on the gold price increases. As we know the value of gold has relative purchasing power remains. The cost price that would be predicted is for budgeting POFD (Plan of Future Development) in onshore oil and gas field as part of the 30 years contract.

Continue reading

1 Comment

Filed under Hari W, Week 08

W8_HWB_Forecast of Construction Cost with Gold Price


1. Problem Definition

In this 8th blog I will try to calculate the construction price forecast for Drilling Site Preparation (DSP) for year 2022 with predictions based on the gold price increases. As we know the value of gold has relative purchasing power remains. The cost price that would be predicted is for budgeting POFD (Plan of Future Development) in onshore oil and gas field as part of the 30 years contract.

Continue reading

3 Comments

Filed under Hari W, Week 08

W7_HWB_Learning Curves for Blog Posting


1. Problem Definition

I have already made ​​seven blogs (including this W7 blog) of the total 22 blogs that have to be made. How to know the time I used to set up W22 blog will be predict from now. I will be made the learning curve from the each time writing blog data. The results of the learning curve is expected to note the time of writing the blog in the foreseeable future.

Continue reading

1 Comment

Filed under Hari W, Week 07

W6_HWB_ Analytical Hierarchy Process (AHP)


1. Problem Definition

As planned in the previous blog, this time I will demonstrate solution in the case of W5 blog with AHP method. The problem is selecting the purchase of motorbike by overlook cost as attribute or criteria. But in the end it tries to put back the cost factor by benefit-cost ratio calculation.

Continue reading

3 Comments

Filed under Hari W, Week 06

W5_HWB_ Multiattributes Decision Non Compensatory Model – Selecting Motorbike


1. Problem Definition

At this fifth blog, I will do a qualitative type of the selection decision method. I am planning to buy a motorcycle for short distance transportation. As we know, many brands and variants of motorcycles in the market with competitive quality and price. Therefore, the selection is more based on a subjective feeling or desire rather than the data in the form of numbers.

Continue reading

5 Comments

Filed under Hari W, Week 05

W4_HWB_Force Field Analysis – Paper Topic


1. Problem Definition

Paper topic that I’m going to execute, it’s been approved by DR PDG. But before that, in determining the topic of paper to be written, I have the choice of two topics which both have positive advantages in my point of view. More analysis needs to be done in order to determine one between the two topics before submit for approval.

Continue reading

1 Comment

Filed under Hari W, Week 04

W3_HWB_Multiattributes Decision Making – Compensatory Models


1. Problem Definition

At this third blog, I will try to demonstrate what I learned from the book Engineering Economic chapter 14. This technique will be done on the same problem with a problem on my second blog, which is how to choose a water purifier from the many options available.

Continue reading

4 Comments

Filed under Hari W, Week 03