  1. Problem Definition

In this blog I am going to do find out the Payback Period for my PV installation, based on the data that I had used for my W4 Blog. With this Blog, I also would like to use this blog to claim for Problem Solving Work for Engineering Economic Chapter 5 Evaluating a Single Project.

The Payback Period Method calculates the number of year for the cash inflow to just equal to the cast out flow. The Simple Payback Period calculation, which ignores the time value of money, is based on the following formula:

                                    (1-1)

Rk = excess of revenue over expenditure in period k;

Ek = excess of expenditure over revenue in period k;

Ɵ = payback period

I = capital investment at k=0

For Discounted payback Period calculation, which considers the time value of money, the calculation is based on the following equation:

                                (1-2)

Ɵ’ = discounted payback period

i% = MARR

 

2. Alternative Identification

As per my previous blog, in this case I have 3 alternative of PV system.

The alternatives are as follow:

1.    Install 1.5kW system

2.    Install 2kW system

3.    Install 5kW system

For each of the alternatives, the current PV systems characteristic is as per Table 1.

System Capacity (kW)

1.5kW

3kW

5kW

No of panels (ea)

6

12

20

Panel capacity (kW)

0.25

0.25

0.25

Total panel capacity (kW)

1.5

3

5

Panel installation cost

$ 3,002

$ 5,162

$ 8,083

       
Daily PV Output (kWh)

9

18

30

Internal use (kWh)

3

3

3

Export (kWh)

6

15

27

Avg Annual PV Output (kWh)

3,285

6,570

10,950

Internal use (kWh)

1,095

1,095

1,095

Export (kWh)

2,190

5,475

9,855

       
Annual Maintenance Cost      
Checking panels $ 150 $ 150 $ 150
Panel cleaning (ea) $ 20 $ 20 $ 20
Total maintenance cost $ 270 $ 390 $ 550

Table 1. Current PV systems characteristic

The PV system capacity is degraded by 0.05% each year. The PV life time is 30 years. The inverter needs to be replaced every 10 years. The inverter cost is about 25% of the overall installation cost.

The cash flow for each of the alternatives is shown in Figure 2, 3, and 4.

Figure 2. Cash flow for Option 1

Figure 3. Cash flow for Option 2

Figure 4. Cash flow for Option 3

 

3. Outcome for each Alternatives

The calculation result for each options using equation 1-2 are as follow:

Figure 5. Payback calculation for Option 1

Figure 6. Payback calculation for Option 2

Figure 7. Payback calculation for Option 3

 

4. Selection Criteria

A project is acceptable when the payback period is smaller than project’s life time.

 

5. Analysis and Comparison of the Alternative

Based on the calculation results which are shown in Figure 5, 6 and 7, Option 1 will never receive payback time. The amount of energy produce will not be enough to pay the investment. Option 2 and Option 3 shows will reach their payback time. Option 2 will have payback time by year 24, and Option 3 will have the payback time by year 7.

This analysis gives me, as an investor, slightly different perspective. For me, 24 years is quite a long time payback period for an investment. In 24 years I may not even live in the same house. Because of that, my preference is now change from Option 2 to Option 3.

 

6. Performance Monitoring and the Post Evaluation of Result

Option 3 is now my preferred option, as it gives me sooner payback period. That if the parameter of my option still the same as my predictions. If the parameters change, the calculation result will change as well. Once I select the type of PV to be installed, I still need to keep track my actual investment parameter, so then if the parameters change, I can review my investment.

References

Sullivan, William G., Wicks, Elin M., & C.Patrick, Koelling. (2012), Engineering Economy 15th Edition (pp. 205-211). New Jersey, United States: Prentice Hall.

Permana, Arief. (Sept 10, 2013). W6_APE_Low Cost Hotel Accommodation-LCHA, ERR & Payback Period. Retrieved from: https://simatupangaace2014.wordpress.com/2013/09/10/w6_ape_low-cost-hotel-accommodation-lcha-err-payback-period/

Advertisements

1 Comment

Filed under Sadat SD, Week 11

One response to “W11_SSD_Selection of Solar Photovoltaic System Based on Payback Period

  1. Pak Sadat…… Ya ampyun!!! What do the specifications call for in terms of the number of REFERENCES required? How many did you provide?

    Also, I don’t remember where you got your MARR from….??? Why not add another short paragraph explaining again how you got your MARR and then citing the chapters in Engineering Economy on MARR and WACC?

    Also cite Ibu Lita’s paper showing what MARR she recommends we use and why?

    Repost as W11.1………

    Other than those two small but very important errors, you would have gotten 5 stars….

    BR,
    Dr. PDG, Jakarta

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s